Our Projects
Our team at TechWolf.dk, assisting the clients in transforming your business through latest tech capabilities to stay ahead of the curve. Some of our delivered projects for all clients are described below:
Clients on worldwide
Projects Delivered
Field Engineers Worldwide
Perfect Solutions For
IT Technical Support
Deployment of MTR (Microsoft Teams Room) (Ballerup, Denmark)June 2020 & July 2020
Project was based on setup the Microsof Teams Room (MTR) into the 4 different facilities of LEO Pharma Company. In which I have a SOP of hardware and software deployment to run the full setup into 4 rooms. MTR hardware including Mic, Speakers, LED, Media PAD, Desktop machine, hubs and wiring using the industry standards. Also configure the media pad for connectivity.
Extensive Network Site Survey & Topology Diagram (Aalborg, Denmark) Aug 2019 & Aug 2019
The project was based on SIEMENS factory extensive Network Site Survey included the three Data Center flooring, security, power, air-conditioning, Racks & Cabinets measurement, fire protection, spacing for enhansment and UPS backup services. Identify the different network cabinets using the given floor plan, uplinks with the main data center and make a topology diagram accordingly. Th second part of this site survey was to identify the Access Points (APs) position, height, direction and strength of APs for future amendment and mention the positions of APs on Floor Plan Diagram.
ZyXel USG60 Firewall & VPN Configuration (Denmark) Sep 2018 & Sep 2018
The project was based on the configuration of Firewall named ZyXel USG60 at the client end. My major work was to configure the firewall to get access to the Internet using given Static IPs having VLAN from ISP and route the traffic on internal & External networks. Allow some proposed ports on the firewall to get access and also enable Remote Desktop Service port on firewall for the outside network. Configure VPN IPSec to secure the packet transfer over the internet.
Network Site Survey and Deployment Activity (Sweden) April 2018 & June 2018
Conducted the network Survey in April 2018 and in June 2018, deployed the new changes with add, remove and movement of all the devices, Voice/Data Patch Panels and cabling from old rack to new rack. Installed the 2 new Cisco Switches 3850 12x48 UPOE with stacking and moved whole network from old Cisco switch to the new Switches according to the plan and also deployed 3 wireless Access Points for wireless internet access in the office. After successful movement of devices, we verified all the office Services computers, laptops, printers, telephones and Wireless Internet Access Points for smoothen the office work
Deployment&Bootstrap configuration of VEDGE Routers. (Denmark) Feb 2019 & Feb 2019
Project was based on the deployment, bootstrap configuration on box pack cisco VEDGE routers at client end and verification of office network services. My major work was to deploy the box pack Cisco VEDGE rouer, Upgrade the latest IOS, upload the base configurations, verifications of services after completion of work. Also, I did unmount of the old network devices from the network rack.
Win 10 Rollout Activity (Denmark)Feb 2019 & Feb 2018
Project was to rollout the newly arrived laptops, LEDs, dock stations, and other peripheral including windows 10 OS on every desk in the office, login users, verify the application services and resolve the post rollout activity issues. And pack the old machines for delivery